Traductions possibles :

Différences

Cette page vous donne les différences entre la révision choisie et la version actuelle de la page.

en:tramwaybordeaux [2011/01/22 13:06]
127.0.0.1 édition externe
en:tramwaybordeaux [2015/02/18 04:19] (version actuelle)
Ligne 2: Ligne 2:
-{{:fr:demobordeaux.jpg  }}The **Bordeaux tramway network** (French: //Tramway de Bordeaux// ) consists of three lines serving the city of Bordeaux  in southwestern France. The first line was opened on 21 December 2003;  further extensions have increased the route length to 43.9 kilometres  (27.3 mi).+{{fr:tramsfrdoc:demobordeaux.jpg  }}The **Bordeaux tramway network** (French: //Tramway de Bordeaux// ) consists of three lines serving the city of Bordeaux  in southwestern France. The first line was opened on 21 December 2003;  further extensions have increased the route length to 43.9 kilometres  (27.3 mi).